Define the approach
- Inventory the installed battery models, revisions, controller and inverter before selecting the expansion module.
- Ask the system supplier to confirm the allowed configuration, addition procedure and required commissioning records.
- Review mechanical space, electrical interfaces and the plan for verifying the revised system after installation.